ECRA Licence #7018049
Generator

Generator & Transfer Switch Installation

Power outages hit Toronto harder every year. Whether you want a whole-home standby or a safe way to run your portable generator, we install a proper transfer switch, connect it to your panel, pull the ESA permit, and get you protected.

647-835-7757
Residential standby generator on concrete pad connected to home electrical panel Toronto

Typical Installation Time

A transfer switch installation on an existing panel is typically a one-day job. Standby generator hookups involving gas connections, concrete pads, and load shedding modules may take longer and require coordination with a gas contractor.

Generator Electrical Work in Toronto

The most dangerous generator mistake is backfeeding — plugging a generator directly into an outlet without a transfer switch. This can kill utility workers and damage your home. Every generator hookup we do uses a proper transfer switch, with an ESA permit, so it's safe and code-compliant under the Canadian Electrical Code. If you have a portable generator and you've been using extension cords or improvised connections, this is the fix.

Types of Transfer Switches

  • Manual transfer switch — a dedicated panel with selected circuits that can be switched between utility and generator power. Required by the Canadian Electrical Code for portable generator connections. Gives you control over exactly which loads run on generator.
  • Automatic Transfer Switch (ATS) — detects a power outage and starts the standby generator automatically, without any action from the homeowner. Required for whole-home standby generators.

Standby vs. Portable Generators

Standby generators run on natural gas or propane, start automatically, and can power the whole home. They sit on a concrete pad beside the house and connect permanently to both the gas line and the electrical panel via an ATS. Portable generators run on gasoline, require manual setup, and need a proper manual transfer switch and inlet box to connect safely to the home. We do the electrical side of both — for gas connections on standby units, we coordinate with a licensed gas contractor.

ESA Permit Requirement

Any generator connection to your home's electrical system requires an ESA permit in Ontario. This applies to manual transfer switches and ATS installations. We pull the permit and coordinate the inspection — this protects you, your insurance coverage, and anyone working on the utility lines.

How the Work Is Done

  1. 1Load assessment — determine what circuits or loads need backup power.
  2. 2Transfer switch selection — manual transfer switch or automatic transfer switch (ATS) based on the setup.
  3. 3Panel work — install transfer switch at the main panel with proper isolation.
  4. 4Generator inlet or direct connection — install a properly rated inlet box or connect a standby generator directly.
  5. 5Wiring — run appropriately sized conductors from transfer switch to inlet or generator.
  6. 6ESA permit pulled and inspection completed before energizing.
  7. 7Walk-through — demonstrate safe generator operation and transfer procedure to the homeowner.

ESA Permit & Inspection

All electrical work in Ontario requires an ESA permit. We pull the permit and coordinate the inspection — you don't have to manage any of that. Every job is done to Ontario Electrical Safety Code.

Ready to get started?

Call 647-835-7757

Frequently Asked Questions

Ready to get started?

LET'S GET YOUR PROJECT DONE RIGHT

Call or text us at 647-835-7757 — or fill out our quick quote form for a free remote estimate.

Call Now