ECRA Licence #7018049
Equipment Connections

Commercial Equipment Connections in Toronto

New ovens, coolers, dish machines, compressors, rooftop units or machinery need the right supply before they can run. Portman sizes dedicated circuits from the nameplate, installs disconnects and makes the final connection — single-phase or three-phase.

  • Restaurants & cafés
  • Gyms
  • Salons
  • Workshops
  • Medical & dental offices
Call 647-835-7757
Stainless steel equipment and preparation areas in a commercial kitchen

Need commercial service?

647-835-7757

Emergency calls answered 24/7.

ECRA/ESA Licence #7018049
Licensed & insured
ESA notification handled where required
Service calls + project work
When to call Portman

Call Us If…

Real situations, not a capabilities list. If one of these sounds familiar, you're in the right place.

  1. 01Equipment is arriving and the installer needs a supply ready.
  2. 02A new appliance trips a shared circuit.
  3. 03A replacement unit has different electrical requirements than the old one.
  4. 04Equipment needs a local disconnect for servicing.
Equipment

Equipment We Connect

  • Commercial ovens, ranges, fryers and combi units
  • Dish machines, booster heaters and hood fans
  • Walk-in coolers, freezers, ice machines and compressors
  • Espresso machines and beverage equipment
  • Salon dryers, treatment equipment and gym machines
  • Rooftop units and HVAC equipment supplies
  • Workshop machinery, compressors and signage
Stainless steel equipment and preparation areas in a commercial kitchen
Sizing

Start With the Nameplate

Every dedicated circuit is sized from the equipment's nameplate or spec sheet: voltage, phase, full-load current and the protection the manufacturer requires. Send that information with your request and we can confirm whether your panel has room before the equipment arrives.

Coordination

Working With Equipment Installers

Kitchen, refrigeration and HVAC installers need the supply in the right place at the right time. We coordinate rough-in locations and timing so equipment can be set and commissioned without waiting on electrical.

Equipment Connection

  1. STEP 1

    Send nameplate or spec sheets and the install location.

  2. STEP 2

    We confirm panel capacity and the route.

  3. STEP 3

    Written quote for circuit, disconnect and connection.

  4. STEP 4

    ESA notification where required.

  5. STEP 5

    Installation and connection, coordinated with the equipment installer.

  6. STEP 6

    Testing and documentation.

Safety first. If you see smoke or fire, or someone has been shocked, call 911 first. Do not open panels, reset repeatedly tripping breakers or work on live equipment yourself — keep people clear and call us. Urgent? Call 647-835-7757 or see commercial emergency service.

Request commercial service

Something Not Working? Book a Service Call.

Describe the problem, add photos if you have them, and tell us how urgent it is. For emergencies, call instead — forms are not monitored like the phone line.

Request commercial service

For urgent faults, call 647-835-7757. For smoke, fire or immediate danger, move away and call 911. Do not open energized equipment to take photos.

Request commercial service details

Planning a project instead?

Send drawings, specs and schedule through the project quote form.

Request a project quote

Frequently Asked Questions

Need commercial electrical service?

Call Portman Electric · 647-835-7757

Call Now
Call Now